Free site visit · DM & DEWA shut-off plan included · Fixed-price quote in 48 hours.
+971 58 524 3632 Free quote & routing plan
Home Civil Works Pipe Installation Dubai
Pipe Installation & Re-Piping

Pipe Installation & Re-Piping
Contractor in Dubai

City Renovations replaces failing galvanized, CPVC and PPR pipework in Dubai villas and apartments, and installs new hot, cold, waste, gas and sprinkler pipe routes for renovations and fit-outs. We plan shut-offs with DEWA or building management, insulate hot and cold lines for UAE conditions, pressure-test before concealment and hand over test records, material schedules and warranty paperwork.

CPVC / PPR / Copper
Gas authority / LPG-provider compliant
Fire sprinkler coordination
Insulation included
Honest Pricing
CPVC, PPR & copper installs
Gas authority / LPG-provider compliant pipe
Fire sprinkler coordination
Insulation included
48h
Fixed-Price Quote Turnaround
8yr
Experience in the Market
Free
Site Visit & Itemised Quote
100%
Pressure Tested
Pipe Installation Book a free site visit
01
Full Villa Re-Pipe

Pre-2000 villa stock - Jumeirah, Satwa, Mirdif, Al Garhoud. Strip out the corroded galvanized, re-pipe in CPVC or PPR, reinstate.

Older VillasCPVC / PPRScheduled Start
02
CPVC Pipe Installation

UAE standard. Heat-rated. Cost-effective.

UAE StandardHeat ResistantCode-Compliant
03
PPR Pipe Installation

Premium spec. 50-year life. Heat-fused joints.

Heat-FusedPremiumLong Life
04
Copper Pipe Installation

For gas, commercial, and heritage jobs.

Gas LinesCommercialBrazed Joints
05
New Lines & Extensions

Emirates Hills and Arabian Ranches extensions - new wings, guest annexes, majlis additions tied cleanly into existing supply.

Villa ExtensionsSleevedInsulated
06
Pipe Insulation (Hot & Cold)

Stops scalding cold taps. Standard, not extra.

Hot + ColdUAE CriticalClosed-Cell
07
Gas Pipe Installation

Kitchen retrofits in Downtown and Business Bay apartments - gas authority / LPG-provider compliant copper, pressure tested, signed off before commissioning.

Emarat / ADNOC / LPG providerPressure TestedCoordinated
08
Fire Sprinkler Plumbing

Sprinkler pipe routes installed in coordination with a Civil Defence-approved fire contractor or consultant. We pressure-test sections before any concealment, recorded and documented.

CommercialWet SprinklerCoordinated
09
Irrigation Supply Lines

Dedicated line. Sized to your landscape.

DedicatedBackflow PreventionSized to Demand
Pipe Materials

Five Materials. We Pick the Right One.

Quick spec sheet. CPVC, PPR, copper, PEX, HDPE — when each one wins.

UAE Standard
CPVCChlorinated PVC
Joint method Solvent-welded
Temp rating Up to 95°C
Pressure rating 16 bar
Expected life 25+ years
Cost ££
Best for: standard villa & apartment supply. The UAE workhorse — code-compliant, proven, cost-effective.
Premium Villa
PPRPolypropylene Random
Joint method Heat-fused
Temp rating Up to 95°C
Pressure rating 20 bar
Expected life 50+ years
Cost £££
Best for: premium villas, hot water loops. Heat-fused joints (no solvent), longer life than CPVC.
Gas + Commercial
CopperType L / brazed
Joint method Brazed / soldered
Temp rating 200°C+
Pressure rating 25 bar+
Expected life 50+ years
Cost ££££
Best for: gas, commercial, heritage. Specialist applications where temperature or fire-rating matter.
Manifold Use
PEXCross-linked PE
Joint method Crimp / push-fit
Temp rating Up to 82°C
Pressure rating 12 bar
Expected life 40+ years
Cost ££
Best for: manifold & under-floor distribution. Flexible, fewer joints, faster install where specified.
Buried / Mains
HDPEHigh-density PE
Joint method Electro-fusion
Temp rating Up to 60°C
Pressure rating 16 bar
Expected life 50+ years
Cost £££
Best for: buried mains, irrigation supply. Used where corrosion and ground movement are concerns.
Dubai water is hard and warm. Hardness drives scale on the inside of pipework, especially in feeds to water heaters where the temperature gradient accelerates mineral drop-out. Thermal expansion from the heat differential between cold inlet (around 25°C in summer) and hot outlet (60–70°C) means hot-water runs need expansion loops we don't always see in colder-climate plumbing. We spec accordingly: CPVC for hot/cold in re-pipes, PPR for new builds where heat-fusion welds are an option, and accessible service loops at fittings. Where a re-pipe runs through wet areas we sequence it with the bathroom tile work and waterproofing so concealed lines are tested before the membrane goes back, and we coordinate the electrical works for water heaters and pumps on the same programme. On older villas we usually strip-out before re-piping to expose corroded galvanized runs cleanly rather than chasing them blind.
How it works

Call us → We quote → We install.

1
Call us

Tell us the job. Send a photo.

2
Free site visit

We measure. We plan.

3
Fixed quote

Material list. Routing. Price.

4
We install

Same-week start. Coordinated.

5
Pressure test

Tested, signed off, documented.

Pricing

Fixed Prices. No Surprises.

Three starting points. Final price fixed after free site visit.

Single Section Re-Pipe
From AED 2.5K

One run replaced. Fast fix.

What's included
Free site visit
Single supply or waste run
CPVC standard (PPR upgrade)
Insulation included
Pressure tested
Workmanship warranty
New Build / Commercial
From POA

Quoted after free site visit.

What's included
Full project spec
CPVC / PPR / copper
Gas distribution
Fire sprinkler coord.
Drawings integrated
Handover docs

Starting prices. Final quote depends on size, scope, materials. VAT applicable.

Built for the UAE
UAE Rules. We Follow Them.

Cold pipes insulated. Gas pressure-tested. Fire sprinklers coordinated with an approved fire contractor. The UAE details, baked in.

Hot & Cold Insulation
Stops scalding cold taps in summer. Always included.
Emarat / ADNOC / LPG-Provider Gas
Gas authority / LPG-provider compliant, pressure-tested, signed off.
Civil Defence Fire Sprinkler
Coordinated with a Civil Defence-approved fire contractor or consultant.
Why us

Reliable. Fast. Fixed price.

Right Material. No Upsell.

We pick what fits. Honest recommendation.

Insulation Included

Hot & cold. Always. Never extra.

Pressure-Tested Gas Coordination

Gas authority / LPG-provider compliant. Pressure tested. Signed off.

Drawings Coordinated

We work from architect & civil plans.

Pressure Tested

Every install. Documentation provided.

Concealed With Access

Hidden pipes. Easy maintenance access.

Our Commitment

What You Get, In Writing

  • Free site visit + fixed-price quote in 48 hours. No charge to scope the work and put a clear, itemised number in your hands.
  • Zero deposit until you approve the quote. You only commit once the quote is signed off — nothing down to get started.
  • One named site supervisor, daily WhatsApp updates. A single point of contact from the first visit to final handover.
  • Workmanship warranty, stated in your contract. Every job is backed in writing; the period is set per project.
  • In-house plumbers — no subcontractor surprises. Your re-pipe is delivered by our own crews, managed end-to-end.
FAQ

Quick answers.

For villas, we coordinate with DEWA for any meter-side isolation and provide same-day or next-day reinstatement after pressure tests pass. For apartments, we secure the building-management approval letter, book the riser shut-off window, work in 4–6 hour blocks with confirmed reinstatement times, and respect Ramadan reduced working hours. All timings are confirmed in writing before we mobilise.
Typical full-villa re-pipe (3-bed, ~250 sqm, CPVC supply + new manifolds) ranges AED 28,000–55,000 supply-and-install with DM-spec pressure testing and certification. Apartment re-pipes range AED 12,000–25,000 depending on fixture count. Final price is fixed after a free site visit.
Pre-2000 villa with multiple failures? Full re-pipe is usually cheaper than ongoing patches. We assess on a free site visit and recommend honestly.
CPVC for most UAE villas - proven, code-compliant, cost-effective. PPR for premium villas and hot water loops. Both heat-rated for UAE.
Without insulation, "cold" taps run scalding in summer. We insulate hot and cold as standard.
Yes. Gas authority / LPG-provider compliant (Emarat / ADNOC / approved LPG supplier). Pressure tested and signed off before commissioning.
Typically 2–4 weeks. Coordinated with renovation works so finishes aren't disturbed.
Yes. Pressure test certs, material schedules, and install docs for HOA and building handover.
Yes. New supply and re-pipe sections are pressure-tested before concealment, with readings recorded for the handover pack. For apartments and managed buildings, we also coordinate test timing with building management so the riser or water shut-off can be reinstated on schedule.
Yes, if make-good is included in the quote. We can coordinate the opening, re-piping, pressure test, closure, plaster repair, waterproofing and tile reinstatement as one scope so the plumbing work does not leave you managing separate trades.
Book a Plumber

Pipes failing? Re-pipe right.

Free site visit. Fixed-price quote in 48 hours. Same-week starts.

Free site visit
Fixed-price quote in 48 hours
Hot & cold insulation included
Pressure tested. Documented.
Gas authority / LPG-provider compliant
Phone
+971 58 524 3632
WhatsApp
+971 58 524 3632
Email
hello@cityrenovations.ae
Got it. We'll call within 24 hours to book your free site visit.

Private. Never shared.

WhatsApp Get a Quote