Electrical Works Contractor in Dubai
City Renovations installs, rewires and tests electrical systems for Dubai villas, apartments, offices and retail fit-outs. From DB upgrades and lighting circuits to AC isolators, fault diagnosis and full rewires, we size cable correctly, protect circuits with RCD/RCBO devices, coordinate DEWA approvals where required and hand over a signed test certificate.

Insulation & RCD test in progress
From a Single Circuit to a Full Villa Rewire
We take electrical work as a standalone scope, as part of a renovation, or as a fit-out for a new commercial space. On a full villa rewire we often run a clean strip-out before rewiring so old cabling and accessories come out properly before the new installation goes in. Same standards apply across all of it — DEWA-compliant materials, cable sized to the load, RCD-protected, fully tested, certified.
Install, upgrade, or replace consumer units in JLT, DIFC, and Business Bay office floors and apartment-tower units. Proper circuit identification, RCD protection on every final circuit, and a labelled board you can actually read in five years.
Whole-villa rewires for Mirdif, Arabian Ranches, and Emirates Hills properties — and single-circuit replacements where only part of the installation has aged. Concealed conduit in block walls and false ceilings, surface conduit where the build requires it. Isolated area-by-area so the home stays liveable.
General lighting, dimmer circuits, smart-lighting rough-in (Lutron, KNX, Crestron), and feature lighting in Majlis ceilings, gypsum coves, and accent niches — common in Dubai Hills and Palm Jumeirah villa renovations.
13A and 16A sockets, dedicated radials for water heaters and ovens, ring mains where applicable, USB-integrated outlets, and weatherproof externals for villa terraces and pool decks.
DEWA-required isolation switches for every split AC, ducted unit, and exterior condenser — non-negotiable in UAE installations because of the high AC density. Properly fused, accessible, and labelled so any AC service can shut off safely.
Showroom track lighting for Al Quoz retail and Mall of the Emirates / Dubai Mall units, restaurant ambient and accent runs across City Walk and JBR, office grid lighting and emergency luminaires for DIFC and JLT floors. Dimming, scene control, and emergency-tested.
Earth electrode installation where required, main equipotential bonding to the incoming services, and supplementary bonding in bathrooms — the bit most installs skip.
Continuity, insulation resistance, polarity, earth-fault loop impedance, and RCD operating-time tests on every circuit. Written certificate issued on completion.
From First Site Visit to Signed Certificate
A four-step process designed for clients who want clarity up front, a clean run during the work, and a documented handover at the end.
We visit, check the existing installation, identify DB capacity, circuit layout, anything DEWA-flaggable, and discuss the new scope. No cost, no obligation.
Within 48 hours: itemised quote covering DB upgrade (if needed), cabling, accessories, testing, certification, and timeline.
Power isolated to the working area, cables run in conduit, accessories fitted, DB labelled. Daily progress under a site manager.
Full test sequence — insulation, continuity, polarity, RCD, earth-fault loop. Written test certificate issued. Workmanship warranty activated.
DB Upgrades, Rewires, Lighting & Testing





Cables, Conduits, and Accessories — Sized to the Load
Every circuit has a job. Cable size, conduit type, accessory brand, and breaker rating are matched to that job — not picked because they were on the van. Here's what we standardise on across Dubai projects.
Cable cross-section is matched to the breaker, the load, and the cable length. Undersized cable runs hot. We size on the actual draw, not on a guess.
Distribution boards, conduit, and accessories from manufacturers actually used in Dubai's regulated sector. No mystery-brand fittings.
Cable, Breaker, RCD — Matched to the Load
A side-by-side reference for the most common circuits we install across Dubai villas, apartments, and commercial fit-outs.
| Circuit Type | Cable Size | Breaker | RCD Protection | Typical Use |
|---|---|---|---|---|
| General Lighting | 1.5 mm² T&E | 6A or 10A MCB | 30 mA RCBO | Downlights, pendants, gypsum coves, Majlis chandeliers, corridor lighting |
| 13A Socket Radial | 2.5 mm² T&E | 16A or 20A MCB | 30 mA RCBO | Bedrooms, living rooms, study desks, kitchen worktops (separate radial) |
| Water Heater | 4 mm² T&E | 20A or 25A MCB | 30 mA RCBO | Bathroom and kitchen storage heaters — dedicated, switched outside the wet zone |
| Oven / Hob | 6 mm² T&E | 32A MCB | 30 mA RCBO | Built-in ovens, induction hobs, dedicated kitchen radial with cooker switch |
| Split AC Indoor | 2.5 mm² or 4 mm² | 20A MCB | 30 mA RCBO | Each split AC unit on its own dedicated circuit with DEWA isolator |
| AC Outdoor / Ducted | 6 mm² or 10 mm² | 32A or 40A MCB | 30 mA RCBO | Outdoor condensers, ducted FCUs, central AC plant rooms |
| Three-Phase Sub-Main | 10 mm²+ SWA / XLPE | Sized to load | Upstream RCD | Pool plant rooms, lift motors, commercial kitchens, workshop tools |
DEWA-Compliant Work, with the Paperwork Filed for You
Anything that touches DEWA's network — main supply changes, capacity upgrades, meter swaps, shop fit-outs — needs documentation, NOCs, and inspection sign-off. We don't treat that as a side task. We treat it as part of the scope. Applications, drawings, and follow-through are handled so the installation is the one DEWA is happy to energise. On combined services jobs we sequence this alongside pipe installation and MEP coordination so trades aren't tripping over each other on site.
Discuss a DEWA JobFive tests, one signed certificate.
An electrical installation isn't finished when the cover plates go on. It's finished when it's been tested with calibrated instruments and signed off in writing. Every circuit we install or rewire goes through the full sequence — and you keep the paperwork.
The certificate names every circuit, lists each test reading, identifies the test instrument used, and is signed by the responsible electrician. If a future buyer's surveyor or an insurer wants to see evidence of a compliant installation, you hand them this. It's also the document we refer back to if anything ever needs investigating under warranty.
Get certified workShowroom-Grade Lighting and Power Fit-Outs
Retail, restaurant, and showroom electrical is a different discipline — track runs that look intentional, dimming that holds tone across the room, emergency luminaires placed to code, and a panel schedule the landlord's MEP consultant will sign off without redlines. Where recessed fittings sit in a dropped ceiling, we handle the gypsum false ceiling lighting coordination so cut-outs and drivers land exactly where the design intends.

Retail track + accent run, fully dimmable, with a landlord-ready panel schedule.
Three-circuit track with a mix of spot and flood heads, programmed on a DALI-compatible driver bank, with emergency luminaires on the same ceiling grid. Power circuits for tills, display cases, and shop signage on dedicated radials. Panel labelled and certified.
Six Standards We Don't Negotiate On
Every installation built to DEWA-acceptable standards — and where the work needs DEWA approval, we file it for you.
We standardise on accessories and protection from manufacturers that actually have a presence in the UAE supply chain — not no-name imports.
Insulation resistance, continuity, polarity, earth-fault loop, and RCD operation tested on every circuit before sign-off.
30 mA RCD or RCBO protection on every final circuit — not just bathrooms, not just outdoor. The protection that actually saves lives.
On handover you receive a signed installation test certificate listing each circuit and its readings. Keep it with your property papers.
Every circuit we install is backed by a written workmanship warranty. If something we wired fails under normal use, we come back and fix it.
Electrical Questions, Honestly Answered
Ready to Wire It Right?
Tell us about your electrical scope — a DB upgrade, a partial rewire, a full villa, a retail fit-out, or a tripping breaker you can't get to the bottom of. We'll book a free site visit and follow up with a fixed-price, itemised quote within 48 hours.
Your details are private and never shared.