Free site visit. Fixed-price quote in 48 hours. Same-week starts.
+971 4 200 0000 Free quote & routing plan
Home Plumbing Pipe Installation Dubai
Pipe Installation & Re-Piping

Pipes Failing? Re-Pipe Fast.

Fixed-price quote in 48 hours. Same-week starts across Dubai.

CPVC / PPR / Copper
DEWA-compliant gas
Fire sprinkler ready
Insulation included
Free Quote
Material list + routing plan. No surprises.
CPVC, PPR & copper installs
DEWA-compliant gas pipe
Fire sprinkler ready
Insulation included
150+
Re-Pipes Done
48hr
Quote Turnaround
100%
Insulation Included
100%
Pressure Tested
Pipe Installation
Book a free site visit
01
Full Villa Re-Pipe

Old pipes failing? Strip out, re-pipe, done.

Older VillasCPVC / PPRSame-Week Start
02
CPVC Pipe Installation

UAE standard. Heat-rated. Cost-effective.

UAE StandardHeat ResistantCode-Compliant
03
PPR Pipe Installation

Premium spec. 50-year life. Heat-fused joints.

Heat-FusedPremiumLong Life
04
Copper Pipe Installation

For gas, commercial, and heritage jobs.

Gas LinesCommercialBrazed Joints
05
Concealed Pipe Installation

In-wall, ceiling-routed. Access panels included.

In-WallSleevedInsulated
06
Pipe Insulation (Hot & Cold)

Stops scalding cold taps. Standard, not extra.

Hot + ColdUAE CriticalClosed-Cell
07
Gas Pipe Installation

DEWA-compliant. Pressure tested. Certified.

DEWA / Emarat / ADNOCPressure TestedCertified
08
Fire Sprinkler Plumbing

Civil Defence ready. Pressure-tested, signed off.

CommercialWet SprinklerCivil Defence
09
Irrigation Supply Lines

Dedicated line. Sized to your landscape.

DedicatedBackflow PreventionSized to Demand
Pipe Materials

Five Materials. We Pick the Right One.

Quick spec sheet. CPVC, PPR, copper, PEX, HDPE — when each one wins.

UAE Standard
CPVCChlorinated PVC
Joint method Solvent-welded
Temp rating Up to 95°C
Pressure rating 16 bar
Expected life 25+ years
Cost ££
Best for: standard villa & apartment supply. The UAE workhorse — code-compliant, proven, cost-effective.
Premium Villa
PPRPolypropylene Random
Joint method Heat-fused
Temp rating Up to 95°C
Pressure rating 20 bar
Expected life 50+ years
Cost £££
Best for: premium villas, hot water loops. Heat-fused joints (no solvent), longer life than CPVC.
Gas + Commercial
CopperType L / brazed
Joint method Brazed / soldered
Temp rating 200°C+
Pressure rating 25 bar+
Expected life 50+ years
Cost ££££
Best for: gas, commercial, heritage. Specialist applications where temperature or fire-rating matter.
Manifold Use
PEXCross-linked PE
Joint method Crimp / push-fit
Temp rating Up to 82°C
Pressure rating 12 bar
Expected life 40+ years
Cost ££
Best for: manifold & under-floor distribution. Flexible, fewer joints, faster install where specified.
Buried / Mains
HDPEHigh-density PE
Joint method Electro-fusion
Temp rating Up to 60°C
Pressure rating 16 bar
Expected life 50+ years
Cost £££
Best for: buried mains, irrigation supply. Used where corrosion and ground movement are concerns.
Not sure? Most UAE villas: CPVC. Premium villas or hot loops: PPR. Gas: copper. We recommend honestly — no upsell.
How it works

Call us → We quote → We install.

1
Call us

Tell us the job. Send a photo.

2
Free site visit

We measure. We plan.

3
Fixed quote

Material list. Routing. Price.

4
We install

Same-week start. Coordinated.

5
Pressure test

Tested, signed off, documented.

Pricing

Fixed Prices. No Surprises.

Three starting points. Final price fixed after free site visit.

Single Section Re-Pipe
From AED 2.5K

One run replaced. Fast fix.

What's included
Free site visit
Single supply or waste run
CPVC standard (PPR upgrade)
Insulation included
Pressure tested
12-month warranty
New Build / Commercial
From POA

Quoted after free site visit.

What's included
Full project spec
CPVC / PPR / copper
Gas distribution
Fire sprinkler coord.
Drawings integrated
Handover docs

Starting prices. Final quote depends on size, scope, materials. VAT applicable.

Built for the UAE
UAE Rules. We Follow Them.

Cold pipes insulated. Gas certified. Fire sprinklers approved. The UAE details, baked in.

Hot & Cold Insulation
Stops scalding cold taps in summer. Always included.
DEWA / Emarat / ADNOC Gas
Certified, pressure-tested, signed off.
Civil Defence Fire Sprinkler
Coordinated with fire engineer. Approved.
Why us

Reliable. Fast. Fixed price.

Right Material. No Upsell.

We pick what fits. Honest recommendation.

Insulation Included

Hot & cold. Always. Never extra.

DEWA-Certified Gas

Pressure tested. Certified. Signed off.

Drawings Coordinated

We work from architect & civil plans.

Pressure Tested

Every install. Documentation provided.

Concealed With Access

Hidden pipes. Easy maintenance access.

Reviews

4.9 / 5 from 1,800+ clients.

★★★★★

"Pre-2000 villa with failing original pipework — they re-piped the entire property in PPR over 3 weeks, coordinated perfectly with our renovation team, all walls were closed up by the time they finished. Pressure has been rock-steady since. Worth the premium for PPR."

Khalid Al Rashidi · Jumeirah Villa
★★★★★

"We needed gas piping to the new kitchen and BBQ area as part of a major renovation. Their team handled DEWA coordination, certification, and the install — all done in a single phase. Saved us coordinating multiple contractors."

Sarah Chen · Emirates Hills
★★★★★

"Awarded them the full plumbing for our new villa build. Specs to drawings, pressure-tested every section, full handover documentation. The contract administrator on the project commented on how clean their documentation was."

Faisal Al Mansoori · Al Barsha Villa Build
FAQ

Quick answers.

Pre-2000 villa with multiple failures? Full re-pipe is usually cheaper than ongoing patches. We assess on a free site visit and recommend honestly.
CPVC for most UAE villas — proven, code-compliant, cost-effective. PPR for premium villas and hot water loops. Both heat-rated for UAE.
Without insulation, "cold" taps run scalding in summer. We insulate hot and cold as standard.
Yes. DEWA / Emarat / ADNOC compliant. Pressure tested and certified before commissioning.
Typically 2–4 weeks. Coordinated with renovation works so finishes aren't disturbed.
Yes. Pressure test certs, material schedules, and install docs for HOA and building handover.
Book a Plumber

Pipes failing? Re-pipe fast.

Free site visit. Fixed-price quote in 48 hours. Same-week starts.

Free site visit
Fixed-price quote in 48 hours
Hot & cold insulation included
Pressure tested. Documented.
DEWA / Emarat / ADNOC compliant
Phone
+971 4 200 0000
WhatsApp
+971 50 000 0000
Email
hello@citirenovations.ae
Got it. We'll call within 24 hours to book your free site visit.

Private. Never shared.

WhatsApp Call Now